ABOUT INDUSTRIAL

Buddhabhumi Nepal Hydropower Company is established to develop hydropower projects managed by well-experienced professionals, local and successful businessmen from various disciplines such as Management, Engineering and 
Public Affairs; who committed to bring excellence in the world of corporate 
governance in the country.
Beyond our self-governing activities, Buddhabhumi Nepal 
Hydro Power Company has owned 4.993 MW Hydro Power Project License for 
Lower Tadi Khola Hydro Power Project, located in Nuwakot District of central 
Nepal. The headworks area lies about 150 M downstream from the confluence of the Tadi Khola & Chake Khola. The Powerhouse is proposed to be built on the left bank of the alluvium deposit. It is located about 300 M upstream of the headworks of the Aadishakti Hydro Power Plant (5 MW). Alongside our mission of developing the hydropower field in Nepal, we also seek to promote and enable infrastructural 
90%. The development of the project is very well scheduled and targeting to complete by the end of March 2021 or earlier. 
We believe that our hopes of sustaining Nepal with eco-friendly renewable energy, while generating benefits for the community and our stakeholders, are not only rational but also practicable. That is what drives, Buddhabhumi Nepal 
Hydropower Company Limited.Our aspiration to provide Nepal with renewable hydroelectric energy for a cleaner and brighter tomorrow.
Besides, we feel very much delighted for where we are now and the long journey we have traveled from the time when we began. Last but not least, we are very 
much thanks to all the people who led us here from far away. 
!!! HYDROELECTRIC ENERGY FOR A CLEANER AND BETTER TOMORROW   !!! 

COMPANY HISTORY

2007

Founded

2017

Turned Public

2020

90% Development Complete

EXPERIENCED TEAM

DOWNLOAD A COMPLETE CATALOG OF OUR SERVICES AND PROJECTS SPECIFICATIONS
Download